Tidy segregated piles of construction waste placed in between piles of blasted granite. They take on a kind of beauty as they subside into the landscape. The gently sagging drywall might simply be fill, but given that one of the remedial actions on an acidified terrain is to spray it with lime, perhaps gypsum has the same effect.
Drywall. Sudbury building site, September 2011
Brick. Sudbury building site, Sepember 2011
Concrete. Sudbury building site, September 2011
Aha! The ubiquitous blue tarp. Sudbury building site, September 2011
Tire mat, used to blanket a rock explosion. Sudbury buidling site, 2011
Article originally appeared on onsite review (http://www.onsitearchive.ca/).
See website for complete article licensing information.